Ballan Channel Concrete Drops


Detailed earthworks in Ballan
This project consisted of upgrading six existing drop structures along the Ballan Channel, to stop the water from washing away the existing bluestone, and clay material. Our scope was to excavate a 300mm wide trench next to the existing drop structures and create a concrete weir and a concrete base to allow the water to free flow down the channel without causing damage.
